You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Tanggul di Pulau Untung Jawa Sudah 42 Persen

Dike Repair in Untung Jawa Island Reaches 42 Percent

Dike repair in east side of Untung Jawa Island, Seribu Islands, reaches 42 percent. Currently, along 126 meters has been repaired from total 300 meters to be repaired.

This dike will be connected to Sakura Beach

Seribu Islands Water Resources Sub-dept. Head, Mustajab said, dike repair is using cube-shape old material which is re-arranged and cemented thus can be stronger.

"This dike will be connected to Sakura Beach," he said, Tuesday (5/9).

Type A Sea Dike Able to Minimize Flood, Basuki Says

He explained more than 3,000 old cubes were collected since January. It has been collected from the seashore, middle of the sea, or around the damaged breakwater.

"This dike is not only functioned as abrasion holder, but also could be used as ring road because it is constructed surround the island," he closed.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye658 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye583 personTiyo Surya Sakti
  3. East Jakarta Red Cross Provides Aid to Utan Kayu Utara Fire Survivors

    access_time07-08-2026 remove_red_eye445 personNurito
  4. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye417 personAldi Geri Lumban Tobing
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye413 personAnita Karyati